IT | EN | DE
  • Panic exit doors

    UNI EN 14351-1

  • Doors and Windows

    UNI EN 14351-1

  • Gates

    UNI EN 13241-1

  • Shutters

    UNI EN 13659

Videos

Publications

  • Mosquito nets dark curtains

    UNI EN 13561

  • Steel and aluminum structures

    UNI EN 1090-1:2012

  • Machinery Directive

    2006/42/CE

  • MANAGE YOUR PRODUCTION ON-LINE

    directly from BuildAPP Portal with our innovative product for Factory Production Control (FPC).

  • PUT CORRECTLY THE PRODUCTION PROCESS FOR CE MARKING

    also in Mobility to consult on real time all Job documentation, all Offers and all the Forms of your FPC.

  • PRODUCE BY YOUSELF ALL DOCUMENTS

    request for CE Trademark of your products included the new Declaration of Performance for CPR and the CE Conformity Declaration for Machinery Directive.

  • KEEP A CONTINUOUS UPDATING

    about low duties and documentation to provide your clients with, without be warried about regulation changes!

highlight

System 1

Manufacturer duties:
  • Have a Control Plan of Production (FPC);
  • Execute ITT Tests, c/o Notified Test Lab, on samples drown from its production line in conformity with FPC;
  • Build and deliver to the Client:
        - Declaration of Performance (DOP) and CE Trademark of the product
        - Operation and Maintenance Manual of the product

Duties of the notified authorities which issues a certificate of costancy of performance:
  • determination of type-product ( ITT test sampling included), type of calculations...;
  • initial inspection of the manufacturing factory and production factory control;
  • surveillance and continuous evaluation of the production factory control.
×

System 3

Manufacturer duties:
  • Have a Control Plan of Production (FPC);
  • Execute ITT Tests, c/o Notified Test Lab, on samples drown from its production line in conformity with FPC;
  • Build and deliver to the Client:
        - Declaration of Performance (DOP) and CE Trademark of the product
        - Operation and Maintenance Manual of the product

The notified Authority does'nt have duties to make
×

System 3

Manufacturer duties:
  • Have a Control Plan of Production (FPC);
  • Execute ITT Tests, c/o Notified Test Lab, on samples drown from its production line in conformity with FPC;
  • Build and deliver to the Client:
        - Declaration of Performance (DOP) and CE Trademark of the product
        - Operation and Maintenance Manual of the product

The notified Authority does'nt have duties to make
×

System 4

Manufacturer duties:
  • Have a Control Plan of Production (FPC);
  • Execute ITT Tests, c/o its own manufacturing site and under his own responsibility, on samples drown from its production line in conformity with FPC;
  • Build and deliver to the Client:
        - Declaration of Performance (DOP) and CE Trademark of the product
        - Operation and Maintenance Manual of the product

The notified Authority does'nt have duties to make
×

System 4

Manufacturer duties:
  • Have a Control Plan of Production (FPC);
  • Execute ITT Tests, c/o its own manufacturing site and under his own responsibility, on samples drown from its production line in conformity with FPC;
  • Build and deliver to the Client:
        - Declaration of Performance (DOP) and CE Trademark of the product
        - Operation and Maintenance Manual of the product

The notified Authority does'nt have duties to make
×

System 2+

Manufacturer duties:
  • have a Control Plan of Production (FPC);
  • appoint a Welding Coordinator;
  • qualify the welding processes and welders;
  • form the insider Non-descructive Tester
  • perform ITT tests required by its production process
  • prepare a DOP according to Reg. 305/2011(CPR)
  • CE marking the products according to UNI EN 1090-1:2012
  • ..........................................

Tasks of the Notified Body issuing the certificate of constancy of performance:
  • preliminary check documents of the production system and existing qualifications
  • initial inspection of the manufacturing plant and production control
  • monitoring and evaluation as per Appendix B of the UNI EN 1090-1:2012
×

Macchinery Directive 2006/42/CE

Manufacturer duties:
  • have a Control Plan of Production (FPC);
  • design and manufactur machines according to the RES defined in the Annex I of the Machinery Directive;
  • Prepare the Technical File according to Annex III of the Machinery Directive;
  • take appropriate Conformity assessment procedures according Art.12 of the Machinery Directive
  • prepare the Conformity CE Declaration according to Annex II of the Machinery Directive
  • CE marking the products according to the Art. 16 of the Machinery Directive
  • ..........................................

The Notified Body involved in the company when:
  • the manufactured machine is considered "dangerous" and placed in Annex IV 16 of the Machinery Directive
  • the manufacturer asks, on a voluntary basis, the evaluation of the production system
×
×
×
×

Our partners

×